Marsden Park Building
Inspections

A barrier that stopped at the slab edge

One continuous layer, or no layer at all.

Marsden Park 2765 · 2 February 2026

Fully licensed & accredited

  • NSW Fair Trading NSW Fair Trading
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

In short: Barrier not carried beneath the whole slab, and punctures left untaped.

What it does

Separates the slab from ground moisture, and performs only as one unbroken layer beneath the entire pour.

What we recorded

On one Marsden Park job the barrier did not extend beneath the whole slab. On another, punctures were left unsealed.

Why both amount to the same thing

A gap at the edge and an untaped puncture are each an opening in a layer whose function is continuity.

What follows

Moisture into the slab, typically showing much later as flooring lifting or persistent damp at the edges.

The fix

Extend the sheet, lap it correctly, tape the punctures. Minutes of work the day before the pour.

Written by our local inspection team from work carried out in Marsden Park. Licensed building practitioners.

Guides

More new construction stage inspections guides for Marsden Park

All guides →

Book a building inspection in Marsden Park

Instant online pricing for Marsden Park, or contact the booking team.

FAQ

Questions Marsden Park owners ask about this

Can it be repaired after?

Not beneath a poured slab. Afterwards you manage perimeter drainage, which is mitigation rather than a fix.

Is some puncturing expected?

Yes, during construction. What matters is that punctures are found and taped before the pour.

Who should be checking?

The builder. Confirming it actually happened is what an independent set of eyes is for.

Is it common?

It is among the most frequent pre-pour findings anywhere, not only here.

Get a Free Quote