Marsden Park Building
Inspections

Eleven pinholes, and none visible from the doorway

The most repeated finding in this suburb's set.

Marsden Park 2765 · 2 March 2026

Fully licensed & accredited

  • NSW Fair Trading NSW Fair Trading
  • Australian Society of Building Consultants Australian Society of Building Consultants
  • Strata Community Association Strata Community Association
  • Building Dispute Practitioners Society Building Dispute Practitioners Society

In short: Pinholes through wet area membranes on Marsden Park builds.

What a pinhole is

A break in the applied membrane about the width of a pen tip, usually a burst bubble in the coat or debris beneath it.

Where we found them

Eleven records across the Marsden Park jobs: shower recesses, a niche and the main drain.

Why they pass unnoticed

They survive a glance from the doorway. Finding them means going over the membrane closely with light.

What happens next

Water passes through, tracks under the screed and appears as a damp skirting in the adjoining room a year or two later.

The economics

Closing one before tiling takes the waterproofer minutes. Finding it afterwards means removing tiles, screed and often the shower.

Written by our local inspection team from work carried out in Marsden Park. Licensed building practitioners.

Guides

More pci / handover guides for Marsden Park

All guides →

Book a building inspection in Marsden Park

Instant online pricing for Marsden Park, or contact the booking team.

FAQ

Questions Marsden Park owners ask about this

Is one really a defect?

Yes. Continuity is the whole function of the membrane, so a single break is a path for water.

Can the waterproofer patch it?

Usually, with an additional coat over a properly prepared area, before tiling.

When can this be inspected?

In the gap after the membrane cures and before tiling starts, often two or three days.

Do builders accept it?

Most will, since the item points to AS 3740 and fixing it then costs very little.

Get a Free Quote