Marsden Park Building
Inspections

When the handover list is short

Six findings, and why that is a good sign.

Owner Inspections · Marsden Park 2765 · 2026-03-30

In short: What a thin practical completion list actually tells you.

What we found

Six photographs from the Marsden Park handovers behind this site: slow draining, loose elements, a fitting in the wrong place and non compliant work.

Why we say so

It would be easy to pad the page. The honest reading is that the weight of these jobs' findings came earlier.

What that implies

Spend at frame, lock-up and waterproofing. A short handover list is what a well inspected build looks like at the end.

Still worth doing

Yes, because the list must exist in writing before you pay, or it becomes a warranty claim afterwards.

What it does not mean

That handover inspections are optional. You cannot know in advance that the list will be short.

Written by the Owner Inspections team from inspections carried out in Marsden Park. Licensed building practitioners, NSW Fair Trading licence 366177C.

Guides

More pci / handover guides for Marsden Park

All guides →

Book a building inspection in Marsden Park

Instant online pricing, or talk to the booking team on 1300 471 805.

FAQ

Questions Marsden Park owners ask about this

Should I skip handover then?

No. You are buying the written record at the point your money is still leverage.

What if my list is long?

Then the split between structural and cosmetic is what matters, and the report sets it out.

Do slow draining fixtures get fixed?

Generally yes. At handover it is the builder's item and it is cheap for them to correct.

Suppose I inspect only at the end?

You get a presentable house with an unknown history. Everything decided earlier is already covered.

CallGet a Free Quote