A single failure, measured against what the drawing and the standard required.
A defect investigation is measured against the approved drawings and engineering for the property, the National Construction Code, the Guide to Standards and Tolerances 2017 and the Australian Standard relevant to the element.
0 checkpoints across 0 areas on a standard Marsden Park defect investigation report. We need the lot reachable and your builder aware an independent inspector is attending. Where a stage is unfinished, the report says so rather than passing it.
No defect grid appears on this page; the explanation is below.
New Construction Stage Inspections Seven checks through a Marsden Park build, before each stage is covered.
Pre-Handover (PCI) Inspections The closing list while the final instalment is still yours.
Pre-Purchase Building Inspections A visual inspection to AS 4349.1 of Marsden Park's young resale stock.
Building and Pest Inspections A single visit covering both, with each written up on its own. Instant online pricing, or talk to the booking team on 1300 471 805.
Because we have not completed a defect investigation in Marsden Park. Filling the page with another suburb's findings would invite you to read them as local, so it stays as text.
A defect report runs wide across a property listing what is there. An investigation isolates one failure and works out the cause.
We write it to be usable, but the tribunal wants a report drawn to NCAT Procedural Direction 3, which is a document we prepare on its own.